Preparation: Holes, cracks and imperfections on the walls are fixed with joint compound and sanded smooth. Gaps between trim and walls are caulked. Any stains and recently repaired spots on the walls are primed. Any dust is removed from the baseboards and trim.
Painting: Ceilings are painted first, followed by the walls and then trim. All surfaces receive a high quality paint which leaves a uniform finish on all surfaces.
Clean up: Outlet covers, light fixtures and telephone jacks are reinstalled. Plastic and drop sheets are removed and furniture is put back in its original location. The floor is swept or vacuumed and the paint is labeled and given to the customer.
Quality Assurance: The production manager will do a final inspection with the customer.